
Advanced Search
Find the right product for your project
Al Faisaliah Complex — Structural Waterproofing Completed
Over 12,000 m² of basement and podium deck waterproofed using MAXSEAL® systems, setting a new benchmark for large-scale residential projects in Riyadh.
Article
The Al Faisaliah Residential Complex in central Riyadh marks one of Drizoro's most significant project completions of 2026 — a 48-storey mixed-use tower requiring waterproofing solutions across multiple critical zones.
Project Scope
The project involved three distinct waterproofing challenges: a three-level underground car park with hydrostatic pressure up to 3.5 bar, an elevated podium deck spanning 4,200 m², and planters with integrated irrigation systems requiring root-resistant membranes.
"Drizoro's technical support team was on-site throughout the critical stages. Their application guidance was instrumental in meeting the project's tight 14-week schedule."
Eng. Khalid Al-Rashid, Project Manager
Products Used
- MAXSEAL® SUPER — basement walls and floor slabs (negative pressure)
- MAXSEAL® FLEX M — podium deck and planters
- MAXPATCH® — crack injection and repair prior to waterproofing
- MAXJOINT® — movement joint sealing
Total material consumption reached 48 tonnes across all Drizoro products. The project was completed two weeks ahead of schedule with zero quality non-conformances reported during final inspection.